Former Particleboard Plant For Sale By Owner
Main Building
- Built in 1989, standard steel construction 172,000 sq
ft, ceiling heights varying from 45 to 75 ft, sprinkler
system throughout
|
|
|
|
Raw Material Storage Building
- Built in 1995, “A” Frame Engineered Steel Building, 525
ft Long x 128 ft Deep x 75 ft high, (67,000 sq ft) divided
into 10 equal sized compartments, complete with fully
automatic overhead conveyor system. Building provides
almost 100,000 Tons of Raw Material or Finished Bulk
Storage.
|
|
|
|
Repair Shop
- Built in 1995, standard steel construction approximately 4,000 sq ft.
|
|
|
|
Office Buildings
- Built approximately 1,000 sq ft 1989, built addition 1995,
4,000 sq ft.
|
|